Loading Excellence...
Bindura, Zimbabwe · Special Grant

Gold Findings
Exploration Highlights

An 18.3 ha gold prospect situated within the Harare–Bindura Greenstone Belt, approximately 15 km northwest of Bindura and 100 km northeast of Harare — host to an inferred resource potential of 6.87 Tons (6,871 kg / 220,936 oz) of gold after extraction.

Geological Assessment Note
Based on a 2022 geo-technical review. Inferred resource potential is 6,871 kg (220,936 oz) at 2.2 g/t across 3,106,225 tonnes of ore, plus 10,900 t of dump resource in settling ponds.
Key Metrics

Prospect Overview

2.2 g/t
Avg. Estimated Grade
3.1M t
Estimated Ore Tonnage
6.87 Tons
Inferred Gold Reserve (6,871 kg)
18.3 ha
Special Grant Area

All figures represent geological resource estimates from the geo-technical report.

Gold Findings Prospect Site

Situated in the same Greenstone Belt as Churchill, Gold Dust, and Money Box mines

The prospect benefits from existing infrastructure — a developed shaft (~10 m depth), crushing/grinding circuit, and a cyanidation/vat-leach plant connected to the national electricity grid.

Request Full Report
Gold Findings Exploration & Processing
Exploration Summary

What's Been Found

Geological mapping and bulk sampling confirm gold mineralisation associated with a northwest-trending quartz vein system and a wide silicified shear zone, showing an inferred reserve of 6.87 tons (6,871 kg / 220,936 oz) of gold after extraction.

6.87 Tons Gold Potential: Inferred resource potential yields 6,871 kg (220,936 oz) of gold at an average grade of 2.2 g/t across 3,106,225 tonnes of ore.
Quartz vein & shear zone: Mapping confirmed a wide silicified shear zone (low grade shear zone ~2.7M t @ 2 g/t) and high grade shear zone (280,000 t @ 3 g/t).
Bulk sampling results: Sampling returned 1.2 g/t free gold at ~8 m depth, supporting the estimated average grade.
Existing 10 m shaft & grid power: An on-site shaft developed to ~10 m depth along with crushing/grinding circuit and vat-leach plant connected to national grid.
Custom Milling & Tailings

Dump Resource & Settling Ponds

A dump has been generated from custom milling — CIP dump (leached once) and Vat leach dump in settling ponds awaiting processing.

The CIP Dump Site

The CIP Dump Site

10,000 tonnes of CIP dump material at an estimated grade of 1.5 g/t (yielding 15,000 g / 15 kg gold).

Vat Leach Dump & Settling Ponds

Vat Leach Dump (~900 t)

900 tonnes of Vat leach material in settling ponds at an estimated grade of 2.0 g/t (yielding 1,800 g gold).

Dump Resource Evaluation Table

Dump Category Estimated Tonnage (t) Estimated Grade (g/t) Total Gold (g)
CIP Dump 10,000 t 1.5 g/t 15,000 g (15.0 kg)
Vat Leach Dump 900 t 2.0 g/t 1,800 g (1.8 kg)
Totals 10,900 t 1.54 g/t 16,800 g (16.8 kg)

* Note: The dump resource is ~6,500 t to 10,900 t with a potential yield of 5.8 kg to 16.8 kg of free gold.

Geographic Distribution

Asset Locations Across Zimbabwe

Strategic mining operations across Mashonaland Central Province and mineral-rich belts.

Gold Mine

Location: Bindura, Mashonaland Central Province

SG7996 Gold Prospect, 18.3 ha grant with 6.87 Tons (6,871 kg) inferred reserve.

Chrome Mine

Location: Guruve (Guruwe), Mashonaland Central Province

High-grade Chromium deposits producing annual exports for global markets.

Manganese Mine

Location: Rushinga, Mashonaland Central Province

Substantial Manganese reserves supplying metallurgical operations.

Lithium Mines

Location: Chisambiro & Kafura Mines

Operational Lithium extraction catering to high-demand battery energy sectors.

Gold Findings Background
Investor Documentation

Full Geo-Technical Report Available

The complete 2022 geo-technical review — including detailed assay results, dump resource evaluations, structural analysis, and resource estimation methodology — is available on request.

Request Full Report